Architectural concept of a future four-building data centre campus in a Mediterranean landscape. Not the actual site or final design.
ADRIA DATA CAMPUS · IN DEVELOPMENT

100 MW IT.
A new digital hub.

Adria Data Campus is a 100 MW IT project in active development in Fier, Albania. Electrical connection, international fibre connectivity and cooling water resources provide the infrastructure foundation for hyperscale, AI and high-performance computing.

Explore the campus
Fier, Albania · Southeast EuropeConceptual visualisation · Not final design01 — 06
01 / IT capacity
100MW IT

Full-campus development capacity

02 / Phased development
4 × 25MW IT

Four scalable development phases

03 / Campus footprint
12ha

Indicative masterplan area

04 / Efficiency target
1.25PUE

Design target for energy efficiency

100 MW refers to IT capacity. The campus is being developed in four phases, with technical design tailored to operator requirements.
01 / The campus

One campus. Room to scale.

Adria Data Campus is being developed in four 25 MW IT phases. The phased approach aligns campus infrastructure, operator requirements and long-term growth within a single development programme.

EXPLORE THE DEVELOPMENT PHASES
Cumulative IT development capacity
25MW IT

Establish the foundation.

The first 25 MW IT phase establishes the campus facilities, integrating the project's electrical connection, fibre connectivity and cooling resources.

31.25 MW equivalent site load

Equivalent site load calculated at the 1.25 design PUE target. IT capacity excludes cooling and auxiliary systems.

MODULAR CAPACITY DIAGRAMFIER / AL
Shared power · Cooling · Fibre
02 / Infrastructure

Connected infrastructure. A foundation for growth.

The project has an electrical connection, international fibre connectivity and water resources for cooling, together with access to energy suppliers. These provide an integrated infrastructure foundation for campus development.

01

An electrical connection. A platform to grow.

The project's electrical connection and access to energy suppliers underpin the development of Adria Data Campus. Power systems are being designed around the four-phase campus programme.

Confirmed connectionElectrical infrastructure for campus development

Electrical connection

The project has its electrical connection, providing the foundation for integrating the campus power infrastructure.

Energy suppliers

Access to energy suppliers supports the development of a supply solution aligned with the operator's demand and delivery phases.

Campus power design

UPS, backup power and distribution form part of the campus design. At the 1.25 design PUE target, 100 MW IT corresponds to approximately 125 MW total site load.

03 / Connectivity

Adriatic location. International connections.

Adria Data Campus has international fibre connectivity through EXA Infrastructure's Trans Adriatic Express corridor, linking the Fier location with network routes towards Italy and Greece.

INTERNATIONAL FIBRE CONNECTIVITY
BARIItalyEXA / TAESEMANFIERADRIA DATA CAMPUSGREECEADRIATIC SEA
EXA / TAE · Italy–Albania–GreeceConnectivity schematic, not a geographic map
Connection secured

Connected to international networks.

The project has secured access to international fibre connectivity through EXA Infrastructure and the Trans Adriatic Express (TAE) corridor at Fier.

  • International network routes towards Italy and Greece
  • Fier PoP/ILA interconnection
  • Fibre infrastructure supporting hyperscale and AI requirements
04 / Development

A project in motion. A campus taking shape.

Active project development

GEOLUMETICS and GR Albania are developing Adria Data Campus as a 100 MW IT campus in Fier. The programme brings together integrated infrastructure, operator-led engineering and four scalable development phases.

01

Campus masterplan

A coordinated layout for data halls, power systems, cooling infrastructure, secure access and future growth.

02

Integrated infrastructure

Electrical connection, international fibre and water resources brought together within the campus engineering programme.

03

Operator-led design

Technical solutions tailored to compute density, cooling architecture, resilience and operational requirements.

04

Phased delivery

Four 25 MW IT phases structured to align development, infrastructure expansion and operator demand.

ENGINEERED FOR EFFICIENCY

Performance by design. Scale with purpose.

01

Efficiency target

A design PUE target of 1.25 guides the integration of IT demand, cooling and auxiliary systems.

02

Energy supply

Access to energy suppliers supports a supply strategy aligned with the campus development programme and operator needs.

03

Cooling resources

Available water resources support the cooling design, with efficient water and energy use integrated into the engineering approach.

05 / Developers

Local commitment. Shared delivery.

GEOLUMETICS sh.p.k. and GR Albania are the developers of Adria Data Campus, combining project development and engineering coordination to advance the 100 MW IT campus.

PROJECT DEVELOPER
GEOLUMETICSsh.p.k.

Project development and coordination of the land, infrastructure and approvals workstreams for Adria Data Campus.

Albania
PROJECT DEVELOPER
GRALBANIA

Engineering and project-development coordination, aligning the campus technical design with investor and operator requirements.

Albania · Engineering & project development
STRATEGIC PARTNERSHIPS

Developing together. Creating long-term value.

We welcome discussions with operators, investors and infrastructure partners interested in participating in the development of Adria Data Campus.

01

Hyperscale & AI operators

Shape a campus solution around computing capacity, technical architecture and operational requirements.

Discuss operator requirements
02

Strategic investors

Explore investment and development partnerships for a four-phase, 100 MW IT digital infrastructure project.

Explore a partnership
03

Infrastructure partners

Discuss collaboration across energy supply, cooling, connectivity and specialist campus systems.

Discuss infrastructure

Request the project presentation and detailed technical information from the development team.

06 / Let's talk

Let's build the next chapter.

Request the project presentation, discuss a strategic partnership or connect with our team on technical requirements.

Start a conversation

Detailed project documentation may be shared under NDA.